top of page
pexels-vincent-gerbouin-1167023.jpg

Our Projects

QUALITY CONTROLS

'GREATER GABBARD' project - Boarding of 132 kV power cable for submarine use - Stabi

“Prysmian” factory Pozzuoli (Na)

“Greater Gabbard” project, loading of 132 kV power cable for submarine use.

“CPS” factory Salerno (Sa)

Balancing a steam turbine rotor.

Balancing a Steam Turbine Rotor at 'C.P.S.' (SA).jpg

Shipyards of La Spezia (Sp)

Non-destructive testing with penetrating liquids on sea chests' weldings.

YACHTING/PROJECT MANAGEMENT

MY 46 m in steel Bulb replacement with new structure - coordination and supervision

Livorno shipyards (Li)

Supervision of the reconstruction of traditional stabilizer fins with 0 speed system.

Viareggio shipyards (Lu)

My 46 mt in steel bulb replacement with new structure - coordination and supervision.

Supervision of the reconstruction of traditional stabilizer fins with the 0 Speed system.jpg
MY 52 m steel - Structural modifications to aluminum side doors - coordination

Shipyards of La Spezia (Sp)

My 52 mt steel - structural modifications to aluminum side doors - coordination and supervision.

AUDIT & MANAGEMENT SYSTEM CONSULTING

Lucca (Lu)

Second-party QHSE audit at a well-known company in Lucca that produces and designs submarine valves. Lead auditor appointed by Subsea 7 for the TAQA “Western Isles Development” project.

Piombino (Li) steelworks

Third party audit to verify compliance of management systems with ISO9001, ISO14001, ISO45001 standards

Bubble extruder.jpg

Capannori (Lu)

Consultancy for CE marking of industrial machinery:
bubble extruder for the production of PVA packaging.

bottom of page